search archive
browse archive Up

072 - Bristol and Exeter Railway - Contract 1A

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Three drawings on one sheet. First drawing is of an elevation with section at AB, second drawing is of plan of section at EF, third drawing is of plan of superstructure.

1835-1845

Drawing is of section over the Bath Turnpike Road. Illegible signature on drawing.

21 May 1839

Drawing is a new cut showing soffit of arch of Bath Iron Bridge.

1835-1845

Five drawings on one sheet. First drawing is of an elevation, second drawing is of section at AB, third drawing is of end view, fourth drawing is of plan of superstructure with plan of foundations, fifth drawing is of section at CD. Altered from Drawing No.7.

1835-1845

Drawing is of a sketch showing forming of ballast in a cutting and in an embankment.

1835-1845

Drawing is of a cross section of the river bed showing soffit of arch of Bath Iron Bridge.

1835-1845

Four drawings on one sheet. First drawing is of longitudinal section, second drawing is of a plan, third drawing is for Mr. Elworthy's syphon, fourth drawing is of Mr. Bird's syphon.

1835-1845

Two drawings on one sheet. Drawings are of transverse section of cuttings. Drawing also contains details for estimate cost. Drawing is signed by William Gravatt.

1835-1845

Powered by Preservica
Copyright © Network Rail