search archive
browse archive Up

Historical Engineering Drawings

Object Type: Folder
In root of archive



Title
Description
Date

51 drawings showing bridges, viaducts, tunnels and culverts from the Bristol and South Wales Union Railway.

1/1/45, 12:00 AM

Seven drawings on one sheet. First drawing is of elevation of bridge with trains passing over, second drawing is of plan of superstructure, third drawing is of section longitudinally, fourth drawing is of section at centre of main pier, fifth drawing is of section at 144ft arch, sixth drawing is of section at 100ft arch, seventh drawing is of section at centre of 20ft arch. Consulting engineer: J Walker esq., engineer: TE Harrison esq., Drawing drawn by David Bremner.

1/1/34, 12:00 AM

6 drawings showing Monkwearmouth Bridge

1/1/76, 12:00 AM

13 drawings showing Blackfriars Station under the London Chatham and Dover Railway.

1/1/64, 12:00 AM

Drawings showing Leeds City Station.

1/1/50, 12:00 AM

13 drawings from the Great Western Railway Contract 2C between the said railway company and Edward Price showing the line passing through Chippenham. Designed by Isambard Kingdom Brunel.

6/16/39, 11:00 PM

8 drawings and one contract from the Great Western Railway Contract 3C between the said railway company and Edward Price showing the line passing through Langley Burrell to Sutton Benger. Designed by Isambard Kingdom Brunel.

6/16/39, 11:00 PM

5 drawings showing Manchester Piccadilly Station.

1/1/42, 12:00 AM

45 drawings and one contract from the Great Western Railway Contract 1S between the said railway company and Edward Jackson showing the line passing through the parishes of Ardington and Dudcot. Designed by Isambard Kingdom Brunel.

9/16/39, 11:00 PM

50 drawings showing the first Bristol Station designed by Isambard Kingdom Brunel and built by Messrs Isaac and John Norman Brown.

1/21/40, 12:00 AM

12 drawings from the Great Western Railway Contract 2S by the said railway company showing the line passing through the parishes of Ardington and Uffington, Berks. Designed by Isambard Kingdom Brunel.

6/30/39, 11:00 PM

20 drawings and one contract from the Great Western Railway Contract 3S between the said railway company and Mr William Smith Simpson showing the line passing through the parishes of Ashbury and Uffington, Berks. Designed by Isambard Kingdom Brunel.

6/16/39, 11:00 PM

3 drawings showing Contract 1B and St Philips Viaduct

12/31/39, 11:00 PM

59 drawings showing details from Glasgow Central Station and environs

1/1/90, 12:00 AM

37 drawings and one contract from the Great Western Railway Contract 4S between the said railway company and Mr James Thomas Bedborough showing the line passing through the parishes of Swindon and Shrivenham. Designed by Isambard Kingdom Brunel.

6/14/39, 11:00 PM

7 drawings from the Great Western Railway Contract 1R by the said railway company showing the Basilden or Gathampton Bridge. Designed by Isambard Kingdom Brunel.

12/31/34, 11:00 PM

9 drawings from the Great Western Railway Contract 3R between the said railway company and Richard Custance from the Parish of Dudcot to Cholsey. Designed by Isambard Kingdom Brunel.

4/30/38, 11:00 PM

14 drawings of Liverpool Lime Street

1/1/66, 12:00 AM

Powered by Preservica
Copyright © Network Rail