046 - Great Western Railway Contract 5L

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Details of a bridge over a turnpike lane, Maidenhead. Two drawings on one sheet. Working Drawing No. 3 for Contract No. 5L. First drawing is of back elevation, second drawing is of half plan of superstructure.

12/31/35, 11:00 PM

Details of bridge across Mill Pond No. 155 Farnham Royal. Five drawings on one sheet. Drawing No. 9 for Contract No. 5L. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of a general plan with plan of foundations and plan of superstructure, fifth drawing is of transverse section at EF.

12/31/35, 11:00 PM

Working Drawing No. 1 for Contract No. 5L. Drawing is an plan of the bridge over Turnpike Road at Maidenhead.

12/31/35, 11:00 PM

Details of bridge over road No. 12 Taplow. Two drawings on one sheet. Drawing No. 13 for Contract No. 5L. First drawing is of a longitudinal section, second drawing is of plans.

12/31/35, 11:00 PM

Details of bridge over road No. 21 Burnham. Five drawings on one sheet. Working Drawing No. 11 for Contract No. 5L. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of a general plan with plan of foundations and plan of superstructure, fifth drawing is of transverse section at EF.

12/31/35, 11:00 PM

Details of alterations to a skew bridge. Five drawings on one sheet. Drawing No. 11 for Contract No. 5L. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of a general plan with plan of foundations and plan of superstructure, fifth drawing is of transverse section at EF. Altered to a skew bridge.

12/31/35, 11:00 PM

Details of bridge over the road, Langley Marsh Parish. Five drawings on one sheet. Drawing No. 4 for Contract No. 5L. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD but half drawing is missing, fourth drawing is of a general plan including plan of foundations and plan of superstructure, fifth drawing is of transverse section at EF but half drawing is missing.

12/31/35, 11:00 PM

Details of bridge over the turnpike road, Maidenhead. Four drawings on one sheet. Working Drawing No. 2 for Contract No. 5L. First drawing is of section on 'skew', second drawing is of an elevation, third drawing is of section at EF, fourth drawing is of transverse section at CD.

12/31/35, 11:00 PM

Details of bridge between field No. 16 and No. 11 in the parish of Farnham. Six drawings on one sheet. Drawing No. 7 for Contract No. 5L. First drawing is of an elevation, second drawing is of wing walls sections at C and D, third drawing is of longitudinal section at CD, fourth drawing is of end view, fifth drawing is of general plan with plan of foundations and plan of superstructure, sixth drawing is of transverse section at EF.

12/31/35, 11:00 PM

Details of bridge. Five drawings on one sheet. Drawing No. 10 for Contract No. 5L. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of a general plan with plan of foundations and plan of superstructure, fifth drawing is of transverse section at EF.

12/31/35, 11:00 PM

Details of a bridge of the turnpike road, Maidenhead. Two drawings on one sheet. Working Drawing No. 4 for Contract No. 5L. First drawing is of longitudinal section at AB, second drawing is of half plan of foundations.

12/31/35, 11:00 PM

Details of bridge over road No. 12 Taplow. Three drawings on one sheet. Drawing No. 14 for Contract No. 5L. First drawing is of a longitudinal section, second drawing is of an elevation, third drawing is of a transverse section.

12/31/35, 11:00 PM

Details of bridge. Four drawings on one sheet. Working Drawing No. 1 for Extension of Contract No. 5L. First drawing is of an elevation with longitudinal section at AB, second drawing is of transverse section at EF, third drawing is of a plan with plan of foundations and plan of superstructure, fourth drawing is of transverse section at CD.

12/31/35, 11:00 PM

Details of bridge for raod No. 17. Seven drawings on one sheet. Drawing No. 6 for Contract No. 5L. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of section of wing walls at HH, fourth drawing is of transverse section thro' CD, fifth drawing is of section of wing walls at GG, sixth drawing is of a general plan with plan of foundations and plan of superstructure, seventh drawing is of transverse section at EF.

12/31/35, 11:00 PM

Details of works undertaken to widen Taplow Road Bridge. Six drawings on one sheet. First drawing is of an elevation, second drawing is of a transverse section, third drawing is of two sections of the bridge, fourth drawing is of plan of foundations, fifth drawing is of end elevation, sixth drawing is of longitudinal section.

3/16/54, 11:00 PM

Details of bridge over road No. 54 Burnham. Five drawings on one sheet. Drawing No. 12 for Contract No. 5L. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of a general plan with plan of foundations and plan of superstructure, fifth drawing is of transverse section at EF.

12/31/35, 11:00 PM

Details of bridge. Five drawings on one sheet. Working Drawing No. 11 for Contract No. 5L. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of a general plan with plan of foundations and plan of superstructure, fifth drawing is of transverse section at EF.

12/31/35, 11:00 PM

Details of Bridge. Four drawings on one sheet. Drawing No. 4A for Contract No. 5L. First drawing is of an elevation, second drawing is of longitudinal section, third drawing is of a plan, fourth drawing is of transverse section.

12/31/35, 11:00 PM