search archive
browse archive Up

046 - Great Western Railway Contract 5L

Object Type: Folder
In Folder: Historical Engineering Drawings


View Gallery

Title
Description
Date

Details of bridge. Seven drawings on one sheet. Drawing No. 6 for Contract No. 5L. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of section of wing walls at HH, fourth drawing is of transverse section thro' CD, fifth drawing is of section of wing walls at GG, sixth drawing is of a general plan with plan of foundations and plan of superstructure, seventh drawing is of transverse section at EF. Drawing is signed by James Thomas Bedborough, Thomas James Bedborough and Brunel.

12/31/35, 11:00 PM

Details of bridge. Five drawings on one sheet. Drawing No. 4 for Contract No. 5L. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of a general plan including plan of foundations and plan of superstructure, fifth drawing is of transverse section at EF. Drawing is signed by James Thomas Bedborough, Thomas James Bedborough and Brunel.

12/31/35, 11:00 PM

Details of bridge. Five drawings on one sheet. Drawing No. 11 for Contract No. 5L. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of a general plan with plan of foundations and plan of superstructure, fifth drawing is of transverse section at EF. Drawing is signed by James Thomas Bedborough, Thomas James Bedborough and Brunel.

12/31/34, 11:00 PM

Details of culverts. Twelve drawings on one sheet. Drawing No. 15 for Contract No. 5l. First three drawings are of longitudinal sections, drawings four to six are of transverse sections, drawings seven to nine are of elevations, drawings ten to twelve are of plans. Drawing is signed by James Thomas Bedborough, Thomas James Bedborough and Brunel.

12/31/35, 11:00 PM

Details of bridge. Five drawings on one sheet. Drawing No. 9 for Contract No. 5L. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of a general plan with plan of foundations and plan of superstructure, fifth drawing is of transverse section at EF. Drawing is signed by James Thomas Bedborough, Thomas James Bedborough and Brunel.

12/31/35, 11:00 PM

Details of bridge. Three drawings on one sheet. Drawing No. 14 for Contract No. 5L. First drawing is of a longitudinal section, second drawing is of an elevation, third drawing is of a transverse section.

12/31/35, 11:00 PM

Details of bridge. Six drawings on one sheet. Drawing No. 5 for Contract No. 5L. First drawing is of an elevation, second drawing is of transverse section at EF, third drawing is of longitudinal section at AB, fourth drawing is of transverse section at CD, fifth drawing is of a general plan with plan of foundations and plan of superstructure, sixth drawing is of transverse section at GH. Drawing is signed by James Thomas Bedborough, Thomas James Bedborough and Brunel.

12/31/35, 11:00 PM

Details of bridge. Six drawings on one sheet. Drawing No. 8 for Contract No. 5L. First drawing is of an elevation, second drawing is of wing walls sections at C and D, third drawing is of longitudinal section at CD, fourth drawing is of end view, fifth drawing is of general plan with plan of foundations and plan of superstructure, sixth drawing is of transverse section at EF. Drawing is signed by James Thomas Bedborough, Thomas James Bedborough and Brunel.

12/31/35, 11:00 PM

Details of bridge. Six drawings on one sheet. Drawing No. 7 for Contract No. 5L. First drawing is of an elevation, second drawing is of wing walls sections at C and D, third drawing is of longitudinal section at CD, fourth drawing is of end view, fifth drawing is of general plan with plan of foundations and plan of superstructure, sixth drawing is of transverse section at EF. Drawing is signed by James Thomas Bedborough, Thomas James Bedborough and Brunel.

12/31/35, 11:00 PM

Details of bridge. Five drawings on one sheet. Drawing No. 10 for Contract No. 5L. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of a general plan with plan of foundations and plan of superstructure, fifth drawing is of transverse section at EF. Drawing is signed by James Thomas Bedborough, Thomas James Bedborough and Brunel.

12/31/35, 11:00 PM

Details of bridge. Five drawings on one sheet. Drawing No. 12 for Contract No. 5L. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section thro' CD and GH, fourth drawing is of a general plan with plan of foundations and plan of superstructure, fifth drawing is of transverse section at EF. Drawing is signed by James Thomas Bedborough, Thomas James Bedborough and Brunel.

12/31/35, 11:00 PM

Details of cutting and embankment. Two drawings on one sheet. Drawing No. 3 for Contract No. 5L. First drawing is of cross section of embankment No. 1, second drawing is of cutting No. 1.

12/31/35, 11:00 PM

Details of bridge. Two drawings on one sheet. Drawing No. 13 for Contract No. 5L. First drawing is of a longitudinal section, second drawing is of plans. Half of the signatures of James Thomas Bedborough, Thomas James Bedborough and Brunel are present.

12/31/35, 11:00 PM

Details of a bridge over a turnpike lane, Maidenhead. Two drawings on one sheet. Working Drawing No. 3 for Contract No. 5L. First drawing is of back elevation, second drawing is of half plan of superstructure.

12/31/35, 11:00 PM

Details of bridge across Mill Pond No. 155 Farnham Royal. Five drawings on one sheet. Drawing No. 9 for Contract No. 5L. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of a general plan with plan of foundations and plan of superstructure, fifth drawing is of transverse section at EF.

12/31/35, 11:00 PM

Working Drawing No. 1 for Contract No. 5L. Drawing is an plan of the bridge over Turnpike Road at Maidenhead.

12/31/35, 11:00 PM

Details of bridge over road No. 12 Taplow. Two drawings on one sheet. Drawing No. 13 for Contract No. 5L. First drawing is of a longitudinal section, second drawing is of plans.

12/31/35, 11:00 PM

Details of bridge over road No. 21 Burnham. Five drawings on one sheet. Working Drawing No. 11 for Contract No. 5L. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of a general plan with plan of foundations and plan of superstructure, fifth drawing is of transverse section at EF.

12/31/35, 11:00 PM

Powered by Preservica
Copyright © Network Rail