search archive
browse archive Up

099 - West London Railway - West London Deviation

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Deviation. Three drawings on one sheet. First drawing is of an elevation, second drawing is of a plan of superstructure with plan of foundations, third drawing is of section thro' abutment at AB.

09 February 1859

Deviation. Six drawings on one sheet. First drawing is of an elevation of inside of girder shewing corrugated iron lining, second drawing is of transverse section half, third drawing has no annotation, fourth drawing is of end elevation/inside, fifth drawing is of section thro' centre shewing stiffening [plates], sixth drawing is of plan at end.

02 March 1860

Four drawings on one sheet. First drawing is of a longitudinal section, second drawing is of a transverse section through centre arch, third drawing is of transverse section through spandril of centre arch, fourth drawing is of transverse section through [section].

1859-1860

Deviation. Four drawings on one sheet. First drawing is of longitudinal section at AB, second drawing is of longitudinal section at CD, third drawing is of back elevation at EF, fourth drawing is of back elevation at GH.

[1860]

Deviation. Three drawings on one sheet. First drawing is of section at aa, second drawing is of elevation at bb, third drawing is of a plan showing tunnel location.

1859-1860

Two drawings on one sheet. First drawing is of an elevation of a bridge with covered way, second drawing is of plan of foundations. West London Railway Deviation.

1859-1860

Deviation. Three drawings on one sheet. First drawing is of an elevation, second drawing is of plan of superstructure with plan of foundations, third drawing is of section thro' abutment at ab.

1859-1860

1 drawing showing a crane.

1859-1860

[Drawing is a sketch relating to a section of the bridge and is an elevation.]

1859-1860

Drawing is of a plan.

1859-1860

Four drawings on one sheet. First drawing is of an enlarged section of centre girders, second drawing is of section of plate at AA, third drawing is of elevation of outside girders, fourth drawing is of a plan.

1859-1860

Deviation. Five drawings on one sheet. First drawing is of an elevation, second drawing is of plan of superstructure with plan of foundations, third drawing is of back elevation (on square), fourth drawing is of transverse section at AB, fifth drawing is of longitudinal section at CD.

24 June 1859

Deviation. Three drawings on one sheet. First drawing is of a plan, second drawing is of sections at AB and CD, third drawing is of an elevation.

1859-1860

Deviation. Four drawings on one sheet. First drawing is of longitudinal section at AB, second drawing is of longitudinal section at CD, third drawing is of back elevation at EF, fourth drawing is of back elevation at GH. Drawing is signed by Harry Footer.

1859

Deviation. Three drawings on one sheet. First drawing is of section at aa, second drawing is of sectional elevation on the line ab, third drawing is of section at bb.

13 June 1860

Deviation. Nine drawings on one sheet. First drawing is of a section shewing gusset plate, second drawing is of plan of top of at centre, third drawing is of section shewing end, fourth drawing is of elevation at end, fifth drawing is of elevation at centre, sixth drawing is of section shewing butt plates, seventh drawing is of plan at end, eighth drawing is of plan of bottom at centre, ninth drawing is of section shewing stiffening plate.

02 August 1859

Powered by Preservica
Copyright © Network Rail