search archive
browse archive Up

032 - Forth Bridge

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

1 drawing showing the maximum force on columns with 56lbs local wind - friction from 0 to one fourth pressure and temperature from cold to average for the Queensferry and Fife Piershe Queensferry and Fife Piers

1882-1890

8 drawings showing Wind Bracing Bottom Member Bay 1 Upper Portion of Free Cantilever

15 April 1886

Forth Bridge Construction Progress Chart January - March 1887 showing progress in erecting one of the towers. Riveting shown in red, erection in blue

12 January 1887

Eight drawings showing sections and elevations of the Inch-Garvie bottom member between pier of the Forth Bridge.

1882-1889

4 drawings on one sheet showing Bracing of 1st Strut at Skewback

1882-1889

1 drawing showing part plan of Inchgarvie skewbacks with top plate removed to show packings etc.

1882-1889

1 drawing showing elevations for columns for carrying lifting girders for raising viaduct approach girders

25 June 1885

24 drawings showing Sections of Windbracing Bottom Member of Free and Fixed Cantilever

1882-1889

1 drawing showing Queensferry north east pier upper bedplate plan including notes of alterations for Garvie upper bedplates

1882-1889

1 drawing showing the Fife north west pier bolt heads, nuts and saddles

1882-1889

3 drawings on one sheet showing Thermometer Readings Between December and June for Fife Top, Garvie Top and Garvie Tube

1882-1889

5 charts on one sheet showing Thermometer, Rainfall, Barometer, Wind Pressure and Wind Direction Chart for the year 1887

1887

Several drawings on one sheet showing Wind Bracing Bottom Member Bay 1 Lower Portion Free Cantilever

02 July 1886

Powered by Preservica
Copyright © Network Rail