005 - Cheltenham and Great Western Union Railway - Contract No.4

Object Type: Folder
In Folder: Historical Engineering Drawings

▲

View Gallery

Title
Description
Date

Three drawings on one sheet. First drawing is of elevation, second drawing is of sections at E, F, G and H, third drawing is of plan of foundations and plan of superstructure.

6/23/43, 11:00 PM

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section, third drawing is of plan of foundations and plan of superstructure, fourth drawing is of sections at E, F and G, fifth drawing is of transverse section at CD, sixth drawing is of side elevation.

6/23/43, 11:00 PM

Four drawings on one sheet. First drawing is of cutting No. 1, second drawing is of cutting No. 2, third drawing is of cutting No. 3, fourth drawing is of embankment.

6/23/43, 11:00 PM

Details of Bridge. Drawing No. 4 for contract No. 4. Five drawings on one sheet. First drawing is of an elevation, second drawing is of transverse section at CD, third drawing is of a plan of superstructure and plan of foundations, fourth drawing is of longitudinal section at AB, fifth drawing is of sections E, F and G. Drawings signed by [John Blinkhorn and William Blinkhorn] and Isambard Kingdom Brunel.

6/23/43, 11:00 PM

Details of Bridge. Drawing No. 8 For Contract No. 4. Five Drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of a plan, fifth drawing is of transverse section at EF. Drawing signed by John Blinkhorn and William Blinkhorn and Isambard Kingdom Brunel.

6/23/43, 11:00 PM

Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of plan of foundations and plan of superstructure, fifth drawing is of transverse section at EF.

6/23/43, 11:00 PM

Details of Bridge. Drawing No. 5 for Contract No. 4. Five drawings on one sheet. First drawing is of an elevation, second drawing is of a longitudinal section at AB, third drawing is of plan for superstructure and plan of foundations, fourth drawing is of transverse section at CD, fifth drawing is of sections at E, F and G. Drawing signed by [John Blinkhorn and William Blinkhorn] and Isambard Kingdom Brunel.

6/23/43, 11:00 PM

Details of Bridge. Drawing No. 6[.9] for Contract No. 4. Six drawings on one sheet. First drawing is of an elevation, second drawing is a longitudinal section at AB, third drawing is of plan of superstructure and plan of foundations, fourth drawing is of sections at E, F and G, fifth drawing is of transverse section at CD, sixth drawing is of side elevation. Drawing signed by [John Blinkhorn and William Blinkhorn] and Isambard Kingdom Brunel.

6/23/43, 11:00 PM

Four drawings on one sheet, first drawing is of longitudinal section at AB, second drawing is of transverse section at CD, third drawing is of transverse section of arch on square, fourth drawing is of end elevation.

6/23/43, 11:00 PM

Details of Culverts. Drawing No. 10 For Contract No. 4. Eight drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section, third drawing is of elevation, fourth drawing is of longitudinal section, fifth Drawing is of a plan, sixth drawing is of transverse section, seventh drawing is of a plan, eighth drawing is of transverse section.

6/23/43, 11:00 PM

Details of Bridge. Drawing No. 7A For Contract No. 4. Four drawings on one sheet. First drawing is of transverse section at CD, second drawing is of longitudinal section at AB, third drawing is of transverse section of arch on square, fourth drawing is of end elevation. Drawings signed by John Blinkhorn and William Blinkhorn and Isambard Kingdom Brunel

6/23/43, 11:00 PM

Details of Bridge. Drawing No. 7 for Contract No. 4. Three drawings on one sheet. First drawing is of an elevation, second drawing is of sections at E, F, G and H, third drawing is of plan of superstructure and plan of foundations. Drawing signed by John Blinkhorn and William Blinkhorn and Isambard Kingdom Brunel.

6/23/43, 11:00 PM

Details of Culvert. Eight drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section, third drawing is of elevation, fourth drawing is of longitudinal section fifth drawing is of plan, sixth drawing is of transverse section, seventh drawing is of plan, eighth drawing is of transverse section.

6/23/43, 11:00 PM

Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at AB, third drawing is of plan of foundations and plan of superstructure, fourth drawing is of transverse section at CD, fifth drawing is of sections at E, F and G.

6/23/43, 11:00 PM

Sections of Cutting and Embankment. Drawing No. 3 for Contract No. 4. Four drawings on one sheet. First drawing is of a cross section of cutting No. 1, second drawing is of a cross section of cutting No. 2, third drawing is of a cross section of cutting No. 3, fourth drawing is of cross section of embankment. [Drawing signed by John Blinkhorn and William Blinkhorn] and Isambard Kingdom Brunel.

6/23/43, 11:00 PM

Five drawings on one sheet. First drawing is of elevation, second drawing is of transverse section at CD, third drawing is of plan of foundations and plan of superstructure, fourth drawing is of longitudinal section at AB, fifth drawing is of sections at E, F and G.

6/23/43, 11:00 PM