search archive
browse archive Up

021 - Great Western Railway Contract 3B Extension

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Details of the portal of Twerton Long Tunnel. Four drawings on one sheet. Drawing No. 3A for Contract No. 3B Extension. First drawing is of back elevation, second drawing is of section at EF, third drawing is of plan at GH, fourth drawing is of plan at IK. Stamped with McIntosh v G.W.R.C. defendants Documents.

1836-1840

Drawing of a plan for bridge between 13 & 14 Newton. Stamped with McIntosh v G.W.R.C. defendants Documents.

1839-1840

Section of Scobells Dirt near Cross Post Gate indicating Parish boundaries, brook and line of surface of road.

1836-1840

Details of east portal of Twerton Long Tunnel. Three drawings on one sheet. Drawing No. 3 for Contract No. 3B Extension. First drawing is of elevation, second drawing is of section at AB, third drawing is of section at CD.

1836-1839

Details of bridge in No. 13 Newton. Six drawings on one sheet. First drawing is of north elevation, second drawing is of south elevation, third drawing is of transverse section at CD, fourth drawing is of side elevation and section through EF, fifth drawing is of general plan including plan of foundations and plan of superstructure, sixth drawing is of longitudinal section through AB. Stamped with McIntosh v G.W.R.C. defendants Documents. Annotation relating to adjusted height of arch. Stamped with McIntosh v G.W.R.C. defendants Documents.

1836-1840

Five drawings of cross sections in Newton cutting. Stamped with McIntosh v G.W.R.C. defendants Documents.

1839-1840

Section of levels, taken and plotted by Thomas George on 7th June 1836, for GWR Contract 3B. Stamped with McIntosh v G.W.R.C. Defendants Documents. Stamped with McIntosh v G.W.R.C. Defendants Documents.

7th June 1836

Back elevation of Twerton Long Tunnel portal. Four drawings on one sheet. Drawing No. 4 for contract No. 3B Extension for Twerton Tunnel. First drawing of back elevation, second drawing of section at CD and third drawing of section at EF. Fourth drawing of plan of parapet.

1836-1840

Unidentified drawings of sections of [cross sections of land.] Stamped with McIntosh v G.W.R.C. Defendants Documents.

1839-1840

Details of Bridge. Five drawings on one sheet. Working Drawing No. 4 for Contract No. 3B Extension. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at EF, fourth drawing is of general plan including plan of foundations and plan of superstructure, fifth drawing is of transverse section at CD. Stamped with McIntosh v G.W.R.C. defendants Documents. [With pencil annotations]

1836-1840

Drawing of long section of Twerton Long Tunnel with hand written calculations. Stamped with McIntosh v G.W.R.C. Defendants Documents.

1836-1840

Cross sections of the Twerton Cutting. Purple shading shows work executed by Charles Wilkins before October 1837, the pink shading shows work executed by David McIntosh subsequent to October 1837Levels taken and plotted 26th August 1836 by Thomas George.

30th October 1841

Drawing is of plans for positions of trimming girders and parapets for bridge with notes and calculation relating to its construciton. Attached are instructions for the position of newel in relation to the wall on the SE wing wall. Signed by Bell. Stamped with McIntosh v G.W.R.C. Defendants Documents. Stamped with McIntosh v G.W.R.C. Defendants Documents.

1839-1840

Two drawings on one sheet. Drawing No. 1 for Contract No, 3B Extension. First drawing is a general plan of area for proposed line through Newton Mead including diversion of Turnpike Road. Second drawing is of longitudinal section and is a cross section of land through parishes of Newton St. Lee and Twerton including cutting No. 1 and tunnel. Stamped with McIntosh v G.W.R.C. defendants Documents.

1836-1840

Three drawings on one sheet. Drawing No. 4A for contract No. 3B Extension for Twerton Tunnel. First drawing of back elevation, second drawing of transverse section at GH and third drawing of plan at IK.

1836-1839

Back elevation of Twerton Long Tunnel portal. Four drawings on one sheet. Working drawing No. 3A for Contract No. 3B extension for Twerton Tunnel. First drawing of back elevation, second drawing of section at EF, third drawing at section GH and fourth drawing at section IK.

1836-1839

Details of Tweton LongTunnel east portal. Four drawings on one sheet. Drawing No.3 for Contract No. 3B Extension for Twerton Tunnel at 109 miles, 3 chains. First drawing of the east front elevation , drawing two is of section at AB, drawing three is of section at CD and drawing four is of section at LM.

1836-1840

Cross section of Twerton Long Tunnel. Drawing No. 2 for Contract No. 3B Extension. elevation of part of tunnel. Stamped with McIntosh v G.W.R.C. defendants Documents.

1836-1840

Powered by Preservica
Copyright © Network Rail